August 14, Weihua 180 ton teeming crane, 90+90 tons charging semi-gantry crane, 100 ton overhead crane, etc. A total of seven sets cranes delivered to Kazakhstan, serving the steel project of ArcelorMittal in Kazakhstan.
On July 5th, the main structure of Weihua's 500t super-large metallurgical teeming ladle crane was successfully rolled off the assembly line, again breaking the manufacturing record of Weihua's metallurgical ladle crane, and further consolidating the leading position of Weihua's super-large metallurgical teeming crane manufacturing strength.
Recently, Weihua's 2,000 ton rail mounted gantry crane was successfully delivered at Lufeng Offshore Engineering Base, the largest offshore wind power port in China. It not only refreshed Weihua's super-large product innovation and R&D strength in the field of offshore wind power, but also boosted the vigorous development of China's offshore wind power industry, and promoted the transformation of the local energy structure to a low-carbon, green, and clean environment.
Recently, two sets ME10t+3t 190m ultra high lifting height gantry cranes for shaft construction are independently developed, designed and produced by Weihua and successfully passed the acceptance and certification of SINOHYDRO BUREAU 14 CO., LTD and put into operation.
The two sets ultra-high-lift gantry cranes for exhaust shafts. Serving the main civil construction and metal structure installation projects of Zhejiang Jinyun Pumped Storage Power Station, and will help the construction of the main project and supporting projects of the pumped storage power station.
Integrity is the pure gold that the Chinese nation's five thousand years of traditional culture has refined through history and years, and it is the basic moral code of citizens.
Integrity is the foundation of life for people and the root of development for enterprises. Throughout Weihua's 34-year development history, integrity runs through and is the core and soul of Weihua's corporate culture.
In January 2021, Weihua 7 sets double-girder overhead cranes ordered by a metal company in Dhaka, Bangladesh arrived. According to the contract agreement, the installation task is completed by Weihua Crane.
April 21, 2022, four sets 50 ton gantry cranes from Weihua sails to Indonesia to officially serve the billet production and manufacturing project of an iron and steel group in Indonesia. This project orders totals 6 sets of 50t gantry cranes, of which two cranes have been installed and put into use on site.
The 320 ton, 31 meter span four-beam four-track teeming crane for Tangshan Wenfeng Special Steel Co., Ltd. was delivered.
As the core equipment of its production workshop, Weihua 5 sets of 320t four-beam four-track ladle cranes respectively located in Smelting Workshop and Refining Workshop, they will provide safe, reliable, intelligent and efficient services for a modern steel mill.
The project products include one set MQ25t-32m level luffing crane and four sets MQ40t-38m level luffing crane, all of which adopt the structure of double boom and cylindrical gantry. All operating mechanisms adopt AC variable frequency speed regulation, and the whole machine adopts PLC control system, full variable frequency stepless speed regulation and fault monitoring system.