Waste Handling Cranes
Description
Open+
Close-

Waste handling cranes play a key role in modern incineration plants. Waste handling cranes require stable, fast and safe operation in demanding environments where the moment the waste arrives, the crane needs to stack, weigh, mix and deliver to the incinerator with maximum efficiency.

Usually there are two waste handlers above the waste area, and one of the cranes is used as a backup to ensure minimal downtime.

To enable 24/7 continuous operation of waste handling cranes, our waste handling cranes offer reliability and outstanding performance in a compact and robust design. It can be operated in manual, semi-automatic or fully automatic mode, which greatly improves the production efficiency of the crane.

Manual type:

The operator controls the crane using the linkage console.

Semi-automatic type:

The grabbing operation is manual control, and the automatic control part includes moving to the charging port, weighing and charging.

Fully automatic type:

Once the crane receives the charging signal from the charging port, the crane begins to perform each step automatically, moving to the trash can, lowering the grip, grabbing the waste, lifting the waste, moving to the charging port, weighing, charging and returning to position. It will automatically repeat the same action.

Standard waste handling crane, its usual lifting capacity is 4~32 tons, its typical span is 18~35 meters, our intelligent waste handling crane, with its excellent performance, can usually handle 800-2000 tons per day scrap.

We provide waste handling cranes, functions and services designed to meet the needs of sustainable energy production.

As a professional waste disposal crane manufacturer, Weihua Crane has 34 years of experience in the crane industry, we can provide you with a full range of grab cranes according to different needs.

You can choose according to your needs, or you can consult our experts, we can provide you with the best solution for Waste Handling Cranes.

Features
Open+
Close-

1. High lifting height, anti-sway operation.

2. Real-time dynamic measurement.

3. Capture status monitoring, troubleshooting alerts and reporting statistics.

4. Adapt to harsh working conditions: high temperature, humidity, more dust and gas corrosiveness.

5. Work load: The average working time is 8000 hours per year, with high load rate and high working frequency.

6. Reliable work to ensure smooth production.

Capacity (t/d) 800-1,000 1,000-2,000 1,200-1,500
Lifting Weight (t) 8 10 12.5
Grab Volume (m3) 5 6.3 8
Span (m) 19.5-31.5 19.5-31.5 19.5-31.5
Lifting Height (m) 34 36 36
Working Level A8 A8 A8
Lifting Speed (m/min) 4.5-45 4.5-45 5-50
Lower Speed (m/min) 6-60 6-60 7-65
Trolley Traveling (m/min) 4.5-45 4.85-48.5 5-50
Crane Traveling (m/min) 4.8-48 6.5-65 7-70
Rail 43kg/m QU70 QU70
Pictures
All Products
+
Related Products
Projects
Leave a Message
Please fill in the form on the left and we will contact you
Our teams are on hand to provide you with the right lifting solutions.

WhatsApp